> ## Documentation Index
> Fetch the complete documentation index at: https://docs.lerian.studio/llms.txt
> Use this file to discover all available pages before exploring further.

# Pix Key Reconciliation in Lerian Console

> Follow the synchronization between the Pix service and the DICT, start a full reconciliation, and read the reconciliation job history, through the Pix Indirect (BTG) plugin in Lerian Console.

The **Key Reconciliation** page of the **Pix** section shows the synchronization status between the Pix service and the DICT. It also shows the history of the reconciliation jobs. Use it to follow each key type and to start a full reconciliation.

The **Pix** section appears in the Midaz Module when the **Pix Indirect (BTG)** plugin is on. See [Plugin settings](/en/platform/console/plugin-settings).

To see the page, a user needs the `vsync:get` permission. To start a full reconciliation, the user also needs `reconciliation:post`.

## Accessing the Key Reconciliation page

***

<Steps>
  <Step title="Open Pix">
    From the Midaz Module sidebar, expand **Pix**.
  </Step>

  <Step title="Click Key Reconciliation">
    Select **Key Reconciliation** in the submenu.
  </Step>
</Steps>

## Synchronization status

***

The **Synchronization Status** section shows one card for each key type. Each card shows the sync status, the **Local VSync**, the **Last Check**, and the **Last Reconciliation**.

**Trigger Full Reconciliation** starts a full reconciliation. A message then names the key types that the reconciliation started for, and the key types that it skipped.

## Reconciliation history

***

| Column | Description |
| - | - |
| Date | When the job was created. |
| Key Type | The key type of the job. |
| Job Type | The type of the job. |
| Status | Status of the job. |
| Progress | Items that the job processed, out of the total. |
| Added | Entries that the job added. |
| Removed | Entries that the job removed. |
| Duration | Time from the start to the end of the job. |

Filter the history by key type and job type, and set a start date and an end date.

## Related pages

***

<Card title="DICT" icon="code" horizontal href="/en/interfaces/pix-btg/indirect-pix-dict">
  How VSync and the reconciliation of the DICT work in the API.
</Card>


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.