Confirm a reservation (phase two — commit)
Use this endpoint to confirm a single reservation, committing the capacity it holds — phase two of the two-phase reservation flow. Confirm is idempotent — confirming an already-confirmed reservation returns the same CONFIRMED status with HTTP 200.
POST
Confirm a reservation (phase two — commit)

