This flow is a suggested reading of the Núclea and BACEN manuals. The manuals prevail over this page. Your institution, as the participant, validates the flow and implements it on the Lerian APIs. See how to read the diagrams.
Participants
- Your institution. The participant that runs the journey and books its effects.
- Lerian. Lerian SLC, Lerian SILOC and Lerian SPB. They exchange the messages with Núclea and STR, and expose the API and the events your institution uses.
- Núclea. Runs the SLC and SILOC clearinghouses and their settlement windows.
Diagram
Steps
How you know it finished
The command in
ANSWERED with LTR0008R1. After a confirmation, both internal entries carry the same reference. After a rejection, there are no entries. If the command ends in REFUSED or FAILED, reverse the two entries. FAILED means that Lerian SILOC will not deliver the decision, or that two operators closed it because Núclea never answered. Before 16:45 Brasília on the movement date, a FAILED or REFUSED command puts the operation back in ANNOUNCED. The answer is still mandatory: read the operation again, book the two entries again if you confirm, and send a new decision with a new X-Idempotency key. From 16:45, Lerian SLC refuses a new decision with 409. Send your answer, and book the two entries, before 16:45.

